Installation Overview Newsome has efficiently finalised the installation and commissioning of a new 400 kW chiller at a well-known confectionery manufacturing site in York. This initiative supports a substantial step forward in the client’s ESG framework, enhancing operational resilience and achieving measurable reductions in both energy consumption and carbon output. https://livebookmarking.com/story20700224/energy-efficient-400-kw-chiller-installation-achieves-50-000-yearly-energy-savings-and-200-metric-tonnes-co%E2%82%82-reduction